This Metro Vancouver covered multiple streets in Surry and included augering of 36 metres of 1800mm steel casing pipe across 148th Street and 108th Avenue in Surrey, which housed 1500mm steel pipe.
The project was challenged by major road restrictions as well as extensive road rehabilitation.. The scope of this project included:
Supply and install 2.3 km of 1500mm steel pipe c/w 1 "pour-in-place" valve chamber,