Date Posted : August 1, 2024
Metro Vancouver constructed the new 15-kilometers long Douglas Road Water Main, replacing the original water main that was built in the 1940s. This massive watermain stretches from Burnaby to New Westminster.
The scope of this project included:
Copyright © SANDPIPER CONTRACTING LLP
Sitemap | Built by GoOnline.ca