Located at Langley Bypass & 56th Avenue, this project required extensive bypassing of an environmentally sensitive creek system.

The scope of this project included:

  • Removal of 3 1500mm CSP culvert pipes
  • Replace with 35 metres of twin 3m x 1.5m concrete box culverts c/w 4 end walls.
  • Reline existing 1200mm culvert pipe using 900mm Weholite pipe c/w headwalls.