Follow Us:
Call Us:

Date Posted : November 30, 2006


This storm sewer and culverts project was completed in November 2006 for the City of Coquitlam.


Project Scope Highlights

Job #: 205-008

600mm culvert c/w headwall

1500mm flow control manhole

3000mm x 3000mm 20m long reinforced concrete box culvert

Two 3600mm x 3600mm pre-cast reinforced concrete storm/grit chambers

Contract Value

$591,513.00

Contract Owner

City of Coquitlam

Completion Date

Autumn 2006