61-Meter Storm Main Trenchless Installation Gets Underway!
June 26, 2026
While it won't break our previous Horizontal Directional Drilling (HDD) record of more than 700 metres beneath the Harrison River, this project is an impressive feat in its own right.
We're currently installing 61 metres of storm main beneath Stewardson Way in New Westminster using trenchless technology, helping minimize surface disruption while delivering essential infrastructure improvements.
Click here to view this page online with additional details.
9342 194 St. Surrey, BC V4N 4E9
Tel: 604.888.8484
Fax :
Website: www.sandpiper.bc.ca